SOO Green understands the importance of existing infrastructure, including drain tile, which is integral to Midwestern farming activities. When the underground transmission line route intersects with an existing drain tile, smaller tiles will be cut and capped to allow the trench to be dug and conduits installed. Once the conduits are in place, the tiles will be repaired, and the trench will be filled in with existing topsoil. Depending on the size, current use and flow rate of the drain tile, conduits may be placed underneath larger tiles without cutting.